Steps for creating G code in Pro/E: 1: Model reference model and work piece as separate parts in Pro/E 2: Create new “Manufacturing” file 3: Assemble reference model (button on upper right hand column of buttons) 4: Assemble work piece (button just below reference model button) 5: Create new coordinate system for G54 (On Haas TM1, X+ is the long direction of the table pointed right. Y+ is the short direction pointed to the back of the machine. Z+ is pointed up.) 6: Select machine: Resources\Work Center – Accept all defaults and click OK 7: Create new operation: Steps\Operation – Select coordinate system and retract plane 8: Create NC sequences and tools as needed with tool path buttons in the tool bar 9: Play path for entire operation – Right click on operation name in model tree, select “play path” 10: Save .ncl file from “play path” control window (Make sure this is the play path for entire operation not a single sequence) 11: Create G code: Tools\CL Data\Post Process – Select the first Post Processor from the list, UNCX01, and give the program a 4 digit number when prompted 12: Open .tap file in notepad, and G54 to the top of the code Standard tools: 1: open 2: 3/4” end mill 3: 1/2” end mill 4: 1/4” end mill 5: 3/16” end mill 6: 1/8” end mill 7: Center Drill 8: #7 drill (for 1/4-20 tap) 9: 0.25" drill 10: 1/4-20 tap